NETWORKS

The GBU Networks is accelerating the development of renewable gases to meet climate

and sovereignty challenges and the decarbonization needs of its customers.

Energy transmission, distribution

and storage

• Gas distribution and transmission

• Gas storage

• Regasification of LNG

• Electricity transmission

• Renewable gas production

EXPERTISE AND KEY GOALS

Seeking to combine performance and the security of its supply and the development

of a zero-carbon energy mix, ENGIE is pursuing four major strategic lines.

The Group intends to maximize the value of the existing assets, internationalize

its portfolio, increase its electricity transmission network and promote biomethane

production in France and internationally, while focusing on converting some

of its assets to hydrogen.

STRATEGY PURSUED

RELATED GOALS

• 700 km of hydrogen transmission

networks in 2030

• 10 TWh of biomethane

production in Europe, including

5 TWh in France (i.e. 10% of

market share)

• 50 TWh of biomethane produced

in France by 2030

• -30% methane emissions by 2030

vs 2017

• 1 TWh of hydrogen stored

in salt caverns

ENGIE continues to make progress in renewable gases with 492 biomethane

production units, representing an annual production capacity of up to 8.3 TWh.

Five hydrogen projects (in Belgium, France, the Netherlands and Spain), supported

by the European Commission and presented by ENGIE, were selected for 2022.

PROGRESS MADE

21,800

employees

worldwide

4,900 km

of electricity

transmission

networks

255,400 km

of gas distribution

networks worldwide

€2.4 billion

EBIT 2022

COMMISSIONING OF A MAJOR POWER TRANSMISSION LINE

CONTRACT IN BRAZIL

ENGIE has completed the construction of the Gralha Azul project 1000 kilometers

of high voltage lines in the state of Parana in southern Brazil

Gralha Azul project

is the first high voltage line project which was built by Engie in Brazil Its timely

completion is a major success for our teams and demonstrates our capability

to develop such large projects of infrastructures

says Eduardo Sattamini CEO

and Investor Relations Officer of ENGIE Brasil Energia With a 30year operation

and maintenance contract period and expected revenues of BRL 8 billion

this project was built with a capex of BRL 21 billion and mobilized between

3000 and 5000 employees during its three years of construction Power

transmission facilities are a major component of our strategy in Brazil

They increase the Brazilian transmission network reliability While connecting

energy production sites often located in uninhabited areas to dense and

more energyconsumptive areas they also contribute to the development of

renewable energies

DEVELOP THE ROBUSTNESS AND ADAPTABILITY

OF THE NETWORKS IN AN UNPRECEDENTED

ENERGY CONTEXT

“In a context of a sharp reduction in Russian gas

deliveries to Europe and within the framework of

European solidarity on energy security, the GBU

Networks and its entities strongly mobilized in 2022

to deal with this unprecedented situation

said

Eric Stab Managing Director Europe AMEA ENGIE

Networks Elengy with its three LNG terminals in

France broke its historical record for LNG unloading

233TWh ie 65 Storengy has fully played its role

as a crucial player in security of supply by enabling

storage facilities to be filled to 100 at the start of

the 20222023 winter In 2022 GRTgaz achieved a

first in its history by reversing the gas flows to enable

gas transmission from France to Germany GRDF in

France and Distrigaz Sud Retele in Romania responded

to questions from customers in the face of uncertainties

and have prepared for risks to supplies

B U S I N E S S C A S E

Eduardo Sattamini CEO

and Investor Relations Officer

of ENGIE Brasil Energia

Eric Stab Managing Director

Europe AMEA ENGIE Networks

30 - OUR IMPACT

Engie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated Report