ENGIE has set targets to achieve Net Zero Carbon by 2045 and to prevent the emission of 45 Mt of CO

2

every year by its customers by 2030. The Group’s solutions will make this ambition a reality.

A COMPLETE DECARBONIZATION

OFFERING

Last year, on June 14 in Paris,

ENGIE organized the event

“E4: ENGIE4Decarbonization,” where

300 customers and partners could

discover the decarbonization offering

designed by the Group under the name

E360°. The nine solutions it contains

are intended to support the industrial

and tertiary sectors in concrete

decarbonization actions, taking

their economic imperatives into

consideration.

SOLUTIONS ADAPTED TO ALL TYPES

OF CUSTOMERS

Manufacturers, cities, universities…

the Group is developing decarbonization

pathways adapted to each specific case.

• Industrials – Relying on solar power

to move toward net zero emissions

Heineken selected ENGIE for

the construction and commissioning

of a solar thermal power plant with

100% renewable concentration,

that will be installed near its production

plant based in Seville (Spain).

This new solar power plant will reduce

the plant’s natural gas consumption

by 60% during the next 20 years

and will reduce its carbon footprint

by 7,000 tCO

2

 / year.

• Universities – Make the energy

transition a reality

The University of Udine Italy signed

a tenyear partnership with ENGIE

for retrofitting and maintenance

of the energy and technological

systems of its buildings It provides for

the installation of 20000 LED lamps

the replacement of all heating systems

with latestgeneration solutions

the renovation of the cooling units

the installation of three photovoltaic

panels and the installation of

a cogeneration system A gain of 20

in electricity consumption and

a reduction of 900 tonsyear of CO

2

are expected as a result

GOOGLE OPTS FOR A PPA

BASED ON OFFSHORE WIND

ENGIE and Google signed a contract

to purchase renewable electricity

Corporate PPA of 100MW for

12years The energy will be supplied

by the Moray West offshore wind

farm located off the Scottish coast

with a production capacity of 882MW

Scheduled for commissioning in 2025

it is one of the projects in development

by Ocean Winds a 5050 joint venture

by EDP Renewables and ENGIE

The Group will supply Google with a total

of more than 5TWh of green energy

This PPA supports Googles goal to

offer zerocarbon energy 247 by 2030

The solutions proposed

are based on three pillars:

“see far ahead” thanks

to a co-constructed road

map; “reduce costs”

with the implementation

of energy efficiency

solutions; “transform”

via a complete panel

of solutions to

support them in their

decarbonization.

DECARBONIZATION

STRATEGY

SOLAR

ON SITE

ENERGY

PERFORMANCE

HYDROGEN

SOLUTIONS

H2

SUSTAINABLE

MOBILITIES

THE BENCHMARK

MANAGER

AND SUPPLIER

ON-SITE

UTILITIES

URBAN HEATING AND

COOLING NETWORKS

LOW-CARBON

DATA CENTERS

• Cities – Opt for sustainable

cooling solutions

Sunway Property has selected ENGIE

Services Malaysia, in partnership with

Sunway Construction Group, to reduce

CO

2

emissions and install an urban

cooling network in the new mixed-use

quarter Sunway South Quay CP2 in

Kuala Lumpur. This sustainable cooling

solution has a cooling capacity of

more than 7000tons and is expected

to provide a 20 reduction in energy

and CO

2

THE GREEN CORPORATE PPA

THE OTHER WAY TO DECARBONIZE

CONSUMPTION

Power Purchase Agreements or PPAs

are medium and longterm from five

to 20years renewable energy contracts

that allow companies and local authorities

to decarbonize their electricity

consumption and access green reliable

and certified energy at a stable set price

PPAs are termed onsite when the

renewable energy production equipment

financed by ENGIE, is installed at the

user customer’s site, and the customer

itself can then use the energy produced.

They are said to be “off-site” when

the energy production equipment is

not installed at the customer’s site.

SUPPORT CUSTOMERS IN

THEIR LOW-CARBON STRATEGY

44 - OUR IMPACT

Engie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated ReportEngie - 2023 Integrated Report
Powered by Fluidbook