Green bonds issued between January and September 2023

Published on 19 May. 2026

Green Bond – September 2023

PDF

Final Terms for the € 900,000,000 tranche maturing September 6, 2042 (including the Use of Proceeds clause)

04.09.2024 – 550.4 Ko

Green Bond – July 2023

PDF

Final Terms for the CHF 190,000,000 tranche maturing January 4, 2027 (including the Use of Proceeds clause)

29.06.2023 – 484.5 Ko

PDF

Final Terms for the CHF 225,000,000 tranche maturing July 4, 2031 (including the use of Proceeds clause)

13.04.2026 – 483.7 Ko

Green Bond – April 2023

PDF

Final Terms for the GBP 650,000,000 tranche maturing April 3, 2053 (including the Use of Proceeds clause)

30.03.2023 – 621.3 Ko

Green Bond – January 2023

PDF

Final Terms for the € 1,000,000,000 tranche maturing January 11, 2030 (including the Use of Proceeds clause)

09.01.2023 – 708.8 Ko

PDF

Final Terms for the € 1,000,000,000 tranche maturing January 11, 2035 (including the use of Proceeds clause)

09.01.2023 – 710.5 Ko

PDF

Final Terms for the € 750,000,000 tranche maturing January 11, 2040 (including the Use of Proceeds clause)

09.01.2023 – 709.1 Ko

A summary of the amount of proceeds allocated from green bonds in 2023 is presented below:

Table displaying allocated amounts of green bonds in millions of euros for 2023.

Depending on their issue dates, green bonds were allocated under either the March 2020 Green Financing Framework or the 13 June 2023 framework.

The main eligible green projects financed with the proceeds of the green bond issues carried out between January 2023 and September 2023 that meet the conditions of the above-mentioned Green Financing Framework are listed in the following table:

Chart showing allocation of green bonds for renewable energy projects from January to September 2023.

Table showing allocation of green bonds by project type and country for 2023.

The projects (and the related capex) set out in the above table for a total of €4.70 billion are allocated globally to the green bonds issued between January and September 2023, in proportions that finalized the allocation of the green bonds issued between January and July 2023 and partially allocated the green bond issued in September 2023.

Of the funds allocated to eligible green projects during 2023, €1.2 billion related to investments made during 2022 and €3.5 billion to investments made in 2023.

Renewable energy production

Total of €2.6 billion was allocated to eligible green projects related to renewable energy production.
At end 2023, the Group’s installed electricity production capacity, taken at 100%, represented 41% of its total installed capacity. ENGIE continued expansion of renewable assets, mainly wind and solar, and investments in offshore wind via the joint venture, Ocean Winds. With respect to renewable gases, ENGIE acquired Ixora Energy Ltd, a leader in biomethane production in the UK, with a production capacity of 160 GWh per year.

Energy storage

A total amount of €1.7 billion was allocated to eligible green projects relating to energy storage.
The green eligible projects in question include:

  • the acquisition of Broad Reach Power, a Houston-based company specialized in battery storage activities. The transaction involved 350 MW of operational assets, 880 MW of assets under construction with commissioning expected before the end of 2024, and 1.7 GW of projects at an advanced stage of development;
  • the Dinorwig (1,728 MW) and Ffestiniog (360 MW) pumped storage facilities in the United Kingdom, owned and operated by First Hydro, which is 75% owned by ENGIE;
  • the Coo pumped storage plant (Belgium) where investments are being made to expand its storage facilities to increase its installed power by 79 MW;
  • the power battery storage project in Hazelwood, Australia.

Transmission and distribution infrastructure

A total of €155 million was allocated to eligible green projects in this domain.

Energy efficiency

A total of €206 million was allocated to eligible green projects relating to energy efficiency.

Clean mobility

A total amount of 48 million was allocated to eligible green projects relating to low-carbon mobility.

Impact reporting

The impact reporting takes into account only the new projects listed above. Reallocated projects following the buyback of previous issues are therefore excluded.
In the full operation phase, the projects are expected to contribute to avoid 3.7 million tons of CO2 eq. per year:

  • for renewable projects: 2.36 million tons of CO2 eq./year
  • for storage projects: 0.46 million tons of CO2 eq./year
  • for renewable gases projects in infrastructure: 0.49 million tons of CO2 eq./year
  • for energy efficiency projects: 0.34 million tons of CO2 eq./year
    for clean mobility projects: 0.02 million tons of CO2 eq./year

Breakdowns by technology and by region of the impacts in tons of CO₂ eq. per year of the projects are presented below (at 100%).

Pie chart showing avoided emissions by region with percentages for each area.

Contributions to avoided emissions are presented in the following table, using different weighting methods:
a) at 100% regardless of the Group’s ownership rate and the nature of the capex
b) according to the Group’s ownership rate and regardless of the nature of the capex
c) at 100% considering only development capex
d) according to the Group’s ownership rate and taking only the development capex

Avoided CO2 emissions (tCO2eq/year) by technology
Technology (a) linked to all capex at 100% b) linked to all capex at % of ownership c) linked to development capex at 100% d) linked to development capex at % of ownership
Wind power 844,490 371,398 844,490 371,398
Solar Power 1,271,630 597,825 1,271,630 597,825
Geothermal 29,703 7,426 29,703 7,426
Bioenergy 200,603 143,603 186,632 129,632
Hydro 10,376 10,376
Energy storage 466,116 462,305 224,363 220,552
Renewable gas 487,149 487,149 487,149 487,149
Hydrogen 5,191 5,191 5,191 5,191
Energy efficiency 340,713 290,453 340,713 290,453
Clean mobility 19,516 5,358 19,516 5,358
Total 3,675,487 2,382,449 3,409,387 2,033,307

Green bonds issued / associated allocations and impact

https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued in 2026

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between October 2024 to October 2025

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between September 2023 and June 2024

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between January and September 2023

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between October 2021 and September 2022

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between March 2020 and July 2021

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bonds issued between June and October 2019

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bond issued in January 2019

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bond issued in January 2018

chevron_right Find out more
https://www.engie.com/app/uploads/2026/02/green-bonds-V2.jpg

Green bond issued in September 2017

chevron_right Find out more

Find instantly answers to your questions